The firm has no outside assistance for its production, quality control. However, for internal audit, training and environmental compliance outside technical help is often sought.
The firm’s quality management system is look after by manager QA the activities thereof are segregate sequentially and each step is controlled and monitored by strictly adhering to the standard procedure. The activities are as follows:
PRODUCTION PLANNING |
MATERIAL PROCUREMENT |
MATERIAL RECEIPT |
INITIAL TESTING |
PROCESSING AND INPROCESS CONTROL |
FINAL TESTING, REALEASE AND DISPATCH |
ALL THE ABOVE ACTIVITIES ARE CLOSELY MONITORED AND WELL MANAGED |
1) The company is following it’s SOP for self inspection and internal quality audit periodically on regular basis. Some of these audits are also being conducted by external expert, and rest by internal faculty. The inspection reports will be monitored properly and necessary action are taken and reviewed to accomplish the improvement as suggested.
Or desired.
2) All the periodic self inspection reports and action taken reports and review records will be available at the plant.